Monteverde wind farm (Avellino)

The CVA Group has acquired from Tozzi Sud S.p.A. - leading Italian company active in the development and construction of infrastructure and wind power plants in Italy - the Monteverde (Avellino) wind farm, completed and connected in 2018.

The plant has an installed capacity of 37.95 MW and is equipped with 11 Vestas wind turbines (including 3 model V112 and 8 model V117) capable of producing about 73 GWh of wind renewable energy annually, equal to the energy needs of more than 22,000 households. It also avoids the release of more than 18,250 tons/year of CO2 into the atmosphere.

See the full gallery

Characteristics of the plant

Key information

Municipality: Monteverde and Lacedonia (AV)

Commissioning: year 2018

Average annual production: 73,000 MWh

Owner company: CVA Eos S.r.l.

Other information

Average altitude: 600 m asl

Number of wind turbines: 11

Tower height: 3 towers 94 m, 8 towers 91.5 m

Rotor diameter: 3 rotors 112 and 8 rotors 117 m

Efficient power: 37.95 MW

Map

Last update: Jun 16, 2022 09:41:58 (GMT+2)